PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued rapairing the main steel column at the Monumental Stairs Facing East (800x600).jpg Started installing temporary lighting at the 2nd floor Facing East (800x600).jpg Building rebar mats for the slab on grade Facing North-East (800x600).jpg Installed wire mesh prepping for the slab on grade Facing North (800x600).jpg Installing the hand rails at Stair -4 (3rd Floor) Facing East (800x600).jpg
Previous pageNext page Installed wire mesh prepping for the slab on grade Facing North (800x600)
Installed wire mesh prepping for the slab on grade Facing North (800x600)